Back to blog home

Scroll for all blogs, or filter:

January 21, 2021

Beyond A Project Model: Why You Need a Sewer / Storm Master Database

For years, engineer and planning teams have used hydraulic and hydrologic models to adjust and plan for long term changes to the system. Many times, when the core project of the model is completed the model is left without updates for long periods of time. Now utilities and engineering firms are using interconnected modeling databases to support ongoing planning, operations, and real-time system management. The status quo is changing, read this article to learn more:
Read More

February 1, 2021 | Ryan Brown

Benefits of InfoWorks ICM Suite

Infoworks ICM is a powerful modeling tool that can be further valued by using RiskMaster and time series databases (TSDB) which are included in the Infoworks ICM Suite. Essentially, TSDB is a software system that stores information and associates time with a certain value. Instead of being limited to idealized or hypothetical conditions and data, the TSDB in ICM allows you to use actual rainfall events in your simulation or other information collected in the field. To learn more read the following blog...
Read More